ORA Metal Roofing Partners home
Instant estimate

Upload your report. Get your price.

Drop in a Hover or EagleView report and answer a few questions. You get our labor price and a material estimate built the same way we build every quote.

Job address Sample roof. Upload your report to see your job.
Total squares 24.5 sq
1. Your measurement report
No report handy? Try a sample:
Squares getting metal, by pitch (0% waste)
Lines from the report (feet)
17.8 feet of lines per squareTier 2 · Moderate
2. A few questions about the job

Not sure about decking? Leave it at 0. Damage found after tear-off is photographed and approved before any work, at the listed rates.

Your estimate is ready Enter your email to see your price. 24.5 squares · Tier 2 · Moderate. Labor price and material estimate, instantly. We use it to send your estimate and follow up on this job. No spam.
Lock in your price

Send us the job. We'll confirm your exact price.

Upload the three items below and we'll review the job and email your exact install price.

1Hover or EagleView report
2Work order, scope of work or contract
3Aerial and/or elevation photos
Upload files (PDFs and images, all three required)
We'll email your exact pricing back.
Sample quote

What a real ORA quote looks like.

Your exact quote is itemized like this, based on the full takeoff from your measurements.

ORA Metal Roofing Partners
Install Quote ORA-0000 Prepared for: Sample Roofing Co. Project: 123 Example Ln
Measured squares25
Pitch6/12, 6 sq at 10/12
ComplexityTier 3 · Complex
Panel24 ga, 14″, Charcoal
Base labor, 25 measured sq × $480$12,000
Complexity, Tier 3 (25 sq × $20)$500
Steep, 8/12 to 12/12 (6 sq × $15)$90
Skylight re-flash, 2 × $200$400
Total labor, locked in$12,990
Material estimate, 25 sq × ~$465, billed at actual cost≈ $11,625

Sample for illustration only. Materials: we order and bill at actual cost, or you order from our takeoff. Measured squares only, no waste factor.

Included in every square

The full production package, from takeoff to the final walkthrough. No add-on fees for management.

Included in every square
✓Material takeoff & ordering ✓Scheduling ✓On-site install management ✓Homeowner communication ✓Progress photos & documentation ✓Property protection & tarping ✓Magnet sweep, cleanup & walkthrough
✓Tear-off, one layer ✓Dumpster & disposal ✓Titanium UDL30 synthetic underlayment ✓Titanium PSU30 ice & water ✓Englert or McElroy panels formed on site ✓All trim & flashing ✓Pipe boots